Al Khaboura Link Road


Road Name: Al Khaboura Link

Length: 14.5 km

Status: Completed

Road Transport

The dualization of the Al Khaboura Link Road in North Al Batinah Governorate has been completed. The road starts from the Al Batinah Expressway interchange and ends at the Al Khaboura roundabout on Al Batinah Main Road, with a total length of 14.5 km. The project works included upgrading the existing single carriageway to a dual carriageway with two lanes in each direction, constructing several box culverts for rainwater drainage, and providing road safety requirements such as concrete and metal barriers, directional signs, and road markings.

Share Now: |


Related Road Projects

Discover Now
Argut–Sarfeet Road Paving Project (Dhofar Governorate)

Road Name: Argut–Sarfeet Road

Length: 13.5 km

Status: Completed Project

Expansion of Sultan Thuwaini bin Said Road (Rusayl–Bidbid)

Road Name: Sultan Thuwaini bin Said Road (Rusayl–Bidbid)

Length: 27 kilometers

Status: Completed

Design and Construction of Sultan Faisal bin Turki Road (Dibba–Lima–Khasab)

Road Name: Sultan Faisal bin Turki Road (Dibba–Lima–Khasab)

Length: 70 kilometers

Status: Under Implementation

Dualization of Izki–Nizwa Road (South Qaroout – Farq)

Road Name: Izki–Nizwa Road

Length: 30.4 kilometers

Status: Under Implementation

Completion of Sultan Taimur bin Faisal Road Project (Al Batinah Coastal) – Phase One

Road Name: Sultan Taimur bin Faisal

Length: 60 kilometers

Status: Under Implementation

Completion of Sultan Turki bin Said Road Project (Ash Sharqiyah Expressway) – Section Two, Phase Two

Road Name: Sultan Turki bin Said

Length: 52 kilometers

Status: Under Implementation

Dualization of Sultan Said bin Taimur Road (Adam – Haima – Thumrait) – Sections Three, Four, and Five

Road Name: Sultan Said bin Taimur

Length: 400 kilometers

Status: Under Implementation

Harweeb–Miten Road Project (Dhofar Governorate)

Road Name: Harweeb–Miten Road

Length: 420 kilometers

Status: Under Implementation

Wadi Aful Bridge Project (Dhofar Governorate)

Road Name: Wadi Aful Bridge

Length: 300 meters

Status: Completed

Design and Implementation of Shinas Link Road

Road Name: Shinas Link Road

Length: 5.8 km

Status: Completed

Road Links Project for Khazaen Economic City

Road Name: Khazaen Economic City

Length: 7 km

Status: Completed